Intern, Construction Delay
Secretariat · Boston · Los Angeles · Washington, United States
Job summary
Secretariat is hiring a Intern, Construction Delay (on-site, Boston · Los Angeles · Washington, United States).
Stated salary: USD 28 – 32 per year.
Posted on September 8, 2026.
Remotjob summary built from the posting details. The full description is on the original posting.
Details
- Company
- Secretariat
- Work mode
- On-site
- Location
- Boston · Los Angeles · Washington, United States
- Salary
- USD 28 – 32 per year
- Posted
- September 8, 2026
- Open until
- December 9, 2026
How to apply
You apply on the original posting at Secretariat careers (Greenhouse). Remotjob does not charge you to apply.
Apply on the original postingRemotjob is not the employer nor a placement agency, and takes no part in the hiring. The job belongs to the company and source shown; check the details on the original posting. Applying is free: never pay to apply.
Sources and attributionsTerms and conditionsReport this job or request its removal